T. Buck Construction, Inc.
249 Merrow Rd Auburn, ME 04210
207-783-6223 * FAX 207-783-3976
PROPOSAL 1R-1
230 Commerce Way, Suite 302
{Proposal Submitted to: Phone:
Wright-Pierce Fax:
Street: Job Name
(802) 431-1422 Date 12/5/2014
(866) 783-7101
Nashua Wastewater Treatment Facility Headworks Upgrade
City, State & Zip Code:
Job Location:
Portsmouth, NH 03801 Nashua NH
Engineer: Job Phone:
Vandy Mornill
ies hereby submit specifications and estimate for:
Provide labor, material and equipment to replace 30 lockers in the men's locker room.
Labor
Carpenter $ 3,768.93
Laborer $ 337.28
Forklift operator $ 83.71
Equipment
Forklift $ 300.00
Material
Lockers $ 7,480.75
Clean Up 6% $ 251.40
Safety 3% $ 125.70
$ 12,347.76
15% O&P $ 4,852.16
$ 14,199.93
1) Owner will clean oui afl locker above and below lockers
2) No temp. locker facilities will be provided by contractor while work is being completed
3) If this proposal is accepted T Buck Construction requests and additional 3 days be added to the contract time
@ Propose hereby to furnish material and labor complete in accordance with above specifications, for the sum of:
FOURTEEN THOUSAND ONE HUNDRED & NINETY NINE DOLLARS
JAlt material is guaranteed to be as specified. All work to be campleted in a Authorized
workmanlike manner according to standard practices. Any alteration or Signature .
Jiaviation from above specifications involving extra costs will be executed only Mark McPheters
Lipon written orders, and will become an extra charge over and above the
estimate. All agreements contigent upon strikes, accidents or delays beyond
Note: This proposal may be withdrawn
our control, Owner to carry fire, tornado and other necessary insurance. Our by us # not accepted within 5 days.
workers ara fully covered by Workman's Compensation Insurance.
Acceptance of Proposal- the above prices, specifications and
work a5 specified. Payment will ba made as outlined ahove.
Date of acceptance Signature