Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 2/1/2017 - P168

Finance Committee - Agenda - 2/1/2017 - P168

By dnadmin on Mon, 11/07/2022 - 10:28
Document Date
Wed, 02/01/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 02/01/2017 - 00:00
Page Number
168
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__020120…

evaluating the proposed substitute item. ENGINEER may require CONTRACTOR to furnish additional data
about the proposed substitute item.

B. Substitute Construction Methods or Procedures:. If a specific means, method, technique, sequence, or procedure
of construction is shown or indicated in and expressly required by the Contract Documents, CONTRACTOR may
furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by
ENGINEER. CONTRACTOR shall submit sufficient information to allow ENGINEER, in ENGINEER’s sole
discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract
Documents. The procedure for review by ENGINEER will be similar to that provided in subparagraph 6.05.A.2.

C. Engineer’s Evaluation: ENGINEER will be allowed a reasonable time within which to evaluate each proposal or
submittal made pursuant to paragraphs 6.05.A and 6.05.B. ENGINEER will be the sole judge of acceptability. No “or-
equal” or substitute will be ordered, installed or utilized until ENGINEER’s review is complete, which will be
evidenced by either a Change Order for a substitute or an approved Shop drawing for an “or equal”. ENGINEER will
advise CONTRACTOR in writing of any negative determination.

D. Special Guarantee: | OWNER may require CONTRACTOR to fumish at CONTRACTOR’s expense a special
performance guarantee or other surety with respect to any substitute.

E. ENGINEER’s Cost Reimbursement: ENGINEER will record time required by ENGINEER and ENGINEER’s
Consultants in evaluating substitute proposed or submitted by CONTRACTOR pursuant to paragraphs 6.05.A.2 and
6.05.B and in making changes in the Contract Documents (or in the provisions of any other direct contract with
OWNER for work on the Project) occasioned thereby. Whether or not ENGINEER approves a substitute item so
proposed or submitted by CONTRACTOR, CONTRACTOR shall retzmburse OWNER for the charges of ENGINEER
and ENGINEER’s Consultants for evaluating each such proposed substitute.

F. CONTRACTOR ’s Expense: CONTRACTOR shall provide all data in support of any proposed substitute or “or-
equal” at CONTRACTOR’s expense.

6.06 Concerning Subcontractors, Suppliers, and Others

A. CONTRACTOR shall not employ any Subcontractor, Supplier, or other individual or entity (including those
acceptable to OWNER as indicated in paragraph 6.06.B), whether initially or as a replacement, against whom
OWNER may have reasonable objection. CONTRACTOR shall not be required to employ any Subcontractor,
Supplier, or other individual or entity to furnish or perform any of the Work against whom CONTRACTOR has
reasonable objection.

B. If the Supplementary Conditions require the identity of certain Subcontractors, Suppliers, or other individuals or
entities to be submitted to OWNER in advance for acceptance by OWNER by a specified date prior to the Effective
Date of the Agreement, and if CONTRACTOR has submitted a list thereof in accordance with the Supplementary
Conditions, OWNER’s acceptance (either in writing or by failing to make written objection thereto by the date
indicated for acceptance or objection in the Bidding Documents or the Contract Documents) of any such
Subcontractor, Supplier, or other individual or entity so identified may be revoked on the basis of reasonable objection
after due investigation. CONTRACTOR shall submit an acceptable replacement for the rejected Subcontractor,
Supplier, or other individual or entity, and the Contract Price will be adjusted by the difference in the cost occasioned
by such replacement, and an appropriate Change Order will be issued or Written Amendment signed. No acceptance
by OWNER of any such Subcontractor, Supplier, or other individual or entity, whether initially or as a replacement,
shall constitute a waiver of any right of OWNER or ENGINEER to reject defective work.

C. CONTRACTOR shall be fully responsible to OWNER and ENGINEER for all acts and omissions of the
Subcontractors, Suppliers, and other individuals or entities performing or fumishing any of the Work just as
CONTRACTOR is responsible for CONTRACTOR’s own acts and omissions. Nothing in the Contract Documents
shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual
relationship between OWNER or ENGINEER and any such Subcontractor, Supplier or other individual or entity, nor

GC - 22 of 54