  2. Finance Committee - Agenda - 2/1/2017 - P166

Finance Committee - Agenda - 2/1/2017 - P166

By dnadmin on Mon, 11/07/2022 - 10:28
Document Date
Wed, 02/01/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 02/01/2017 - 00:00
Page Number
166
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__020120…

A. CONTRACTOR shall provide competent, suitably qualified personnel to survey, lay out, and construct the Work
as required by the Contract Documents. CONTRACTOR shall at all times maintain good discipline and order at the
Site.

B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent
thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during
regular working hours, and CONTRACTOR will not permit overtime work or the performance of Work on Saturday,
Sunday, or any legal holiday without OWNER’s written consent (which will not be unreasonably withheld) given after
prior written notice to ENGINEER.

C. The following list of streets may not be opened or worked in between the hours of 7:00 AM and 9:00 AM and 3:00
PM and 6:00 PM, Monday through Friday of each week:

Broad Street

East Hollis Street
Concord Street
Amherst Street

D. W. Highway
Kinsley Street

East Dunstable Road
Main Street

6.03 Services, Materials, and Equipment

A. Unless otherwise specified in the General Requirements, CONTRACTOR - shall provide and assume full
responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery,
tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other
facilities and incidentals necessary for the performance, testing, start-up, and completion of the Work.

B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good
quality and new, except as otherwise provided in the Contract Documents. All warranties and guarantees specifically
called for by the Specifications shall expressly run to the benefit of OWNER. If required by ENGINEER,
CONTRACTOR shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and
quality of materials and equipment. All materials and equipment shall be stored, applied, installed, connected,
erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as
otherwise may be provided in the Contract Documents.

6.04 Progress Schedule

A. CONTRACTOR shall adhere to the progress schedule established in accordance with paragraph 2.07 as it may be
adjusted from time to time as provided below.

1. CONTRACTOR shall submit to ENGINEER for acceptance (to the extent indicated in paragraph 2.07)
proposed adjustments in the progress schedule that will not result in changing the Contract Times (or Milestones).
Such adjustments will conform generally to the progress schedule then in effect and additionally will comply with
any provisions of the General Requirements applicable thereto.

2. Proposed adjustments in the progress schedule that will change the Contract Times (or Milestones) shall be

submitted in accordance with the requirements of Article 12. Such adjustments may only be made by a Change
Order or Written Amendment in accordance with Article 12.

GC - 20 of 54