Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 2/1/2017 - P71

Finance Committee - Agenda - 2/1/2017 - P71

By dnadmin on Mon, 11/07/2022 - 10:28
Document Date
Wed, 02/01/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 02/01/2017 - 00:00
Page Number
71
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__020120…

November 16, 2016 Page 3
20161116 Addendum No 1.docx 3066.07

Clarification on Work Performed

1. During the pre-bid meeting, a potential bidder suggested that repairs to penetrations
(shown on Detail 3 on Sheet 7 of the Construction Drawings) in the Draintube™ model
600CW LFG4 D25 Surface Collection Layer be extrusion welded. This was considered,
however; based on discussions with the material manufacturer after the pre-bid
meeting, it was recommended that butyl tape be used instead of welding. This method
has since been discussed with and approved by the City of Nashua.

To clarify, Draintube™ that is cut and removed in order to fit the Draintube™ over the
existing wellheads shall be saved and re-installed/secured with butyl tape. The tape
will be used to rejoin the material and create a seal around the existing risers to the

extent practical. Breaks in the 1-inch diameter Draintube™ pipes shall be reconnected
using snap couplers provided by the Draintube™ manufacturer.

Very truly yours,
SANBORN, HEAD & ASSOCIATES, INC.

R pba

Project Manager
RLC/ESS:rlc

Encl. Table A: LFG Well Depth Summary

cc: Kerry Converse, Jeff Lafleur, Dan Kooken, Kathleen Carragan - City of Nashua

P:\3000s\3066.07\ Source Files\2016 LFG Const\Bidding\Addenda\1\20161116 Addendum No 1.docx