November 16, 2016 Page 2
20161116 Addendum No 1.docx 3066.07
A: The City does not have a designated surveyor. The surveyors below are local and
have worked on this site in the past.
WSP (Nashua, NH)
Hayner Swanson, Inc. (Nashua, NH)
Meridian Land Services, Inc. (Amherst, NH)
8. All excavated material (including waste) can be placed back in the trenches with the
pipe?
A: Excavated Material, where called out on the construction drawings, may include
waste.
9. All excess waste to be hauled by contractor directly to the working face?
A: Yes
10. Site work hours? Saturday and Sunday work?
A: Monday - Friday 7am - 5pm; Saturday 8am-1pm.
11. Any retainage to be withheld from invoicing? If so, amount?
A: Refer to Contract Documents, Article 6: Payment Procedures.
12. No union, davis-bacon, or prevailing wages?
A: No
13. Assume all backfill and or required bedding materials located on-site at no additional
cost to contractor?
A: Soil backfill is available on site for use by the Contractor.
14. How far is the borrow pit located from the proposed work areas?
A: The borrow bit is located adjacent to the landfill (less than % mile).
15. Are the existing well boots (where bentonite seals are to be installed) 10x10 PVC
Boots.? ] assume they are a temporary boots that slide over the well and vacuum riser
and are not welded to any liner? Please clarify.
A: The existing boots are premanufactured 10ft x10ft HDPE and are not welded toa
liner.