The following are the names and addresses of the utilities presumed to be affected; however, the completeness of the
list is not guaranteed.
FairPoint Communications
770 Elm Street
Manchester, NH 03101
Telephone: (603) 645-2705
Attn: Yew Chai
Eversource (formerly PSNH)
780 N Commercial Street
Manchester, NH 03101
Telephone: (603) 882-1387 x5272
Attn: Elizabeth Bradshaw
Pennichuck Water Works Inc.
25 Manchester Street
Merrimack, NH 03054
Telephone: (603) 913-2324
Attn: Peter Tedder
Liberty Utilities
15 Buttrick Road
Londonderry, NH 03053
Telephone: (603) 681-9197
Attn: Andrew Bernier
Comcast
751 East Industrial Park Drive
Manchester, NH 03109
Telephone: (603) 770-0280
Attn: Julio Medina
City of Nashua Fire Dept. Comm. Center
38 Lake Street
Nashua, NH 03060
Telephone: (603) 594-3636
Attn: Jeremy Audette
Amend Subsection 105.07, Cooperation between Contractors, with the following:
Concurrent work may be in progress in the project area by the City, by utility companies, by other contractors hired
by the City, or by other contractors hired by private parties. The Contractor is required to coordinate his activities
with these parties. See Section 105.07, Cooperation between Contractors, of the Standard Specifications. No
additional compensation shall be provided to the Contractor as a result of coordination between the various
contractors.
Add the following paragraph to Subsection 105.10, Inspection of Work:
For the purpose of observing work that affects their respective properties, inspectors for the municipalities, public
agencies, and the utility companies shall be permitted access to the work site. In addition, inspectors may be
assigned by the City of Nashua to oversee construction of the work shown on the Plans, and shall have the authority
to govern the work shown on the Plans. However, any directives that result in an increase in quantities or the
addition of new items shall be authorized and issued through the City. The cost of any and all such inspection shall be
borne by the City.
Add the following paragraph to Subsection 105.17, Project Acceptance:
The Contractor shall notify the Engineer in writing whenever the Contractor believes that all traffic signal work is
complete. In this notification he shall propose a starting date of the fine tuning period, adjustment and testing
period. Such date shall not be effective unless and until the Engineer gives his consent to such date.
Add Subsection 105.20, Notice to Emergency Service and Public Transportation Officials:
Written notice shall be given by the Contractor to all public emergency services or public transportation officials of
his intention to commence operations affecting such utilities at least 48 hours in advance of the commencement of
such operations, and the Contractor shall, at that time, file a copy of such notice with the City. In addition, the
contractor shall provide the officials with a 24-hour contact name and number should any issues arise as a result of
the work.
Construction Specifications.doc 8-3