Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 2/1/2017 - P3

Finance Committee - Agenda - 2/1/2017 - P3

By dnadmin on Mon, 11/07/2022 - 10:28
Document Date
Wed, 02/01/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 02/01/2017 - 00:00
Page Number
3
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__020120…

DAVIS CONSTRUCTION CO

Project Quotation

Bradley Davis
418 Town Farm Rd
Jaffrey, NH 03452
603-630-0848
www.davisconstructionco.net
www.facebook.com/davisconstructionco

Proposal Submitted To: City of Nashua Central Purchasing
Date Issued: Monday, January 23, 2017

Address: 229 Main St Nashua NH 03060

Job Name: Hunt Building Meeting Room Roof Repair

Project Description:

This proposal offers all material and labor needed to provide the full scope of services for the

projects listed below.

Option 1-

Fully remove existing copper flat roof panels over meeting room. Fully remove copper roofing
along inside of parapet walls. Fully inspect existing roof deck where roofing is removed. Provide
%” ISO recovery insulation board and .060 EPDM rubber roofing over flat areas and up inside of
parapet walls. Aluminum termination bar will terminate the EPDM on concrete cap on parapet and
copper flashing will be used to transition from existing copper standing seam roof on the slope, to
the new EPDM roof on the flat. Flex drain insert will be used to transition the new EPDM rubber
roof in to the existing copper scuppers and gutter downspouts. Plaster repair and painting of interior
fireplace wall after roof repair. Corner to corner painting with color match.

Option 2-

Same general scope of work as Option 1 above but all copper will be removed from roof including
the standing seam portion on the low sloped area. This will allow for complete coverage of the
roofing area with EPDM. It will also ensure that the entire roof decking area is accessible for
inspection and that there are no weak points in the roof assemble such as the transition from copper

to EPDM rubber.

For both options above all copper will be scraped with all scrape proceeds returned to Hunt Building
management minus expenses.

Inclusions:

Versico or equal .060 EPDM rubber roofing, adhesive, and insulation board.

60’ Manlift for roof and equipment access.

Removal and disposal of all debris with the exception of copper to be scraped as noted.

Plaster repair and painting of interior fireplace wall after roof repair. Corner to corner painting with
color match.

Exclusions:

Page Image
Finance Committee - Agenda - 2/1/2017 - P3

Footer menu

  • Contact