Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 3/15/2017 - P99

Finance Committee - Agenda - 3/15/2017 - P99

By dnadmin on Mon, 11/07/2022 - 10:27
Document Date
Wed, 03/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/15/2017 - 00:00
Page Number
99
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031520…

ENGINEERING DESIGN PHASE CONTRACT Page 3 of 4
For Professional Services for Treatment Works

expenses in accordance with the attached aghaleost-eelcostshatlinciuds-comsensa-
fee schedule (See Exhibit B). tHestethe ENCIMEED for bisavor serfommed

2. The OWNER agrees to pay and the ENGI- t tract :

NEER agrees to accept for all services under exceplasmotedip-Exbibit sé SeoseoiSouuigen

Exhibit B, Paragraph I — Preliminary Design ancthatthemeneyste-besaidundesthis ites ore

of this AGREEMENT, a fee not to exceed adequateforthewerk proposed _and-shall not
exesed

Ninety-Five Thousand Dollars Dellars

($95,000.00). o————}.

2A. The OWNER agrees to pay and the ENGI- . .

NEER agrees to accept for all services under op IEER 4 e Brees ji ‘ bowel

Exhibit B, Paragraph II — Final Design and . : : : :
Paragraph III Bidding of this AGREEMENT, a 4 es , E Bt g

fee not to exceed seismie-surveys, shall be-at actual costas-defined tS :
To be determined Dollars Spr ee Propered under this Hem is enough-to

TBD). <— exeeptasdotedin Exhibit A Seope of Semices,

3. If separate documents are required for “ES, ;

additional construction contracts on this PRO- ne
JECT, an additional fee as approved by the’. * —
DIVISION shall be paid to the ENGINEER. © > “4 ______§.

4. Prior to formal approval of contract docu- 4 ——_lpje-eleo-aorescd that sasuentiethe ENGL
ments by the DIVISION, the ENGINEER ‘shall NEEPferservicesn relation te cadastral surveys
make such revisions in them as,recommended by and-otherwerkasseciated vith the acquisition of
the DIVISION and agreed to by the ENGINEER.» landseasements,-and rights-of way-essentialte
without additional compensation. After formal — the-construction-of the PROJECT shall -be—at
approval, if it becomes necessary to revise the actual cest-as-defined in TY (8B) 2.-The ENGL
contract documents. for reasons beyond the NEER—further-agrees_that the werk _propesed
control of the ENGINEER, payment for such waderthicitemt-cnouch_to_previde adaguate
revision or revisions shall be made to the ENGI- sites easements and iekts of wos tesserae
NEER subject to approval iby the DIVISION. unencumbered—ceonstruction, —operation,—and

B. Limits of All Payments paterferenee-anyveys The EN GIMEER oles,
1. The ENGINEER hereby assures the ander-this-item-are_adequateforthe work pro-

OWNER and agrees that the felewing fee for his pouedendshellrclensed
services (exclusive of surveys, borings, and Belkirs
certain special services which follow) in con- g

nection with the preparation of final plans, speci-
fications, and contract documents and other work

as generally described under I(A) is adequate to V Additional Covenants
complete the assignment-and-shal net exceed °

Dellars

a A. The ENGINEER agrees to provide in active
s¢—_}. charge of this PROJECT for the life of the contract a

Project Engineer who is a permanent employee of the

2-——THicalss-agresd that paymentiothe ENGL ENGINEER and who is a “qualified sanitary engineer”
NEER-—for—services_in relation _to-enginecnine as defined under the DIVISION'S “Rules and Regula-
surveys iachidinelysglendlecene ofbeorines, tions for the Prequalification of Consulting Engineers.”

DRAFT Primary Tank Upgrades Engineering Contract - Wright Pierce.doc 02/08/06

Page Image
Finance Committee - Agenda - 3/15/2017 - P99

Footer menu

  • Contact