ENGINEERING DESIGN PHASE CONTRACT
For Professional Services for Treatment Works
A. Upon execution of this AGREEMENT, the EN-
GINEER agrees to proceed with all engineering services
as shown in Exhibit A including surveying, drafting,
calculations, borings, and other work as required and
necessary to develop and produce final plans,
specifications, and associated contract documents
involved in the construction of treatment works fer—as
ENGINEER further agrees that said services shall
include, but shall not necessarily be limited to:
1. Plans, Specifications, and Contract Doc-
uments
a. The preparation of detailed plans,
specifications, and contract documents in
accordance with the rules and regulations
of the New Hampshire Department of
Environmental Services, Water Division,
hereinafter called the DIVISION, ready for
the receipt of bids and the award of con-
struction contracts for said construction;
the work shall also include the preparation
of estimates of the cost of construction’ -
based on the contract documents. Prepare
applications with supporting and associat- °
ed documents for Federal, State-and other -
grant or loan programs, Assists» the
OWNER in securing grants or loge ey
State, Federal and other’ ABENCY. 3
b. ‘The furnishing of all the necessary
subsurface investigations and ficld surveys
required for the preparation and comple-
tion of approved plans, specifications, and
contract documents.:.
c. The furnishing ot ten (10) copies of
the final plans, specifications, and contract
documents to the OWNER; one (1) three
@)} copies of which are to be submitted to
the DIVISION. Additional copies to be
available at cost to the OWNER.
The OWNER'S Responsibilities
A. Assist the ENGINEER by placing at his disposal
all available information pertinent to the PROJECT, in-
DRAFT Primary Tank Upgrades Engineering Contract - Wright Pierce.doc
ui.
Iv.
Page 2 of 4
cluding previous reports and other data relative to the
reports.
B. Make provisions for the ENGINEER to enter
upon public and private lands, municipal facilities and
industrial establishments as required to perform work
under this AGREEMENT.
C. The OWNER also agrees to comply with DI-
VISION and Federal requirements (where applicable)
and further agrees to acquire with the assistance of the
ENGINEER all the necessary easements, options or
outright purchases of land for the locations of said
treatment works as shown on the contract plans. The
provisions of this section shall be satisfied prior to
submission of documents referred to in III (A) below. It
is also understood that no approvals of reports or plans
and specifications or other associated documents will be
made* by the DIVISION without fulfillment of this
requirement.”
Time of Completion
A. The ENGINEER agrees that he will submit to the
DIVISION for approval after modification or revision
as recommended by the DIVISION and agreed to by the
ENGINEER, the completed final plans, specifications,
contract, and associated documents in compliance with
the current issue of the DIVISION's standards of design
within the time frames specified in Exhibit B
B. _ It is agreed by the parties to this contract that
failure by the ENGINEER to complete the work within
the time stipulated under III, A, above may be con-
sidered sufficient basis for the debarment of the ENGI-
NEER from the DIVISION'S Roster. of Prequalified
Engineers as provided for under New Hampshire Code
of Administrative Rules Env-Wq 603.08, or the Assess-
ment of liquidated damages as provided for under RSA
485-A: 4, XI
Compensation to be Paid the ENGINEER
A. Method of Payments Amounts of Fees
1. Payment to the ENGINEER, for services
rendered, shall be according to the following
schedule:
Monthly billing based on ENGINEER'S
actual direct labor costs based on a factor
of 2.9494 times direct labor, plus
reimbursable expenses, heurs-and-rates-by
ia rr | ineidental
02/08/06