Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 9/7/2022 - P29

Finance Committee - Agenda - 9/7/2022 - P29

By dnadmin on Sun, 11/06/2022 - 21:45
Document Date
Thu, 09/01/2022 - 11:46
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 09/07/2022 - 00:00
Page Number
29
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__090720…

ENGINEERING REPORT PHASE CONTRACT Page 2 of 7
For Professional Services for Treatment Works
I. Services to be Performed by the ENGINEER

A. Upon execution of this AGREEMENT, the ENGINEER shall proceed with the general administration of construction
and fulltime inspection by qualified personnel of the contractor's work to assure compliance with the contract
documents and any coincident or subsequent changes or change orders for the construction of the treatment
works for the (Fewnr/City) of Nashua, New Hampshire, Sewer Siphon Rehabilitation. Said services shall include,
but shall not necessarily be limited to:

1. General Construction Administration
a. Updating and modifications of contract documents to meet changed site and project conditions or
variations in State or Federal requirements.

Completion of formal contract documents for the award of contracts.

Checking detail construction, shop and erection drawings submitted by the contractor.

Reviewing laboratory, shop, and mill test reports of materials and equipment.

Preparation of drawings and technical material as required to supplement and/or clarify the contract

documents.

g. Review, verification, and approval of estimates for periodic and final payments to the contractors for
submittal to the OWNER and the DIVISION.

h. Periodic inspection of work and final inspection.

i. Observing and reporting performance and qualifying tests required by specifications.

j. Keeping daily records of construction progress and compiling same into progress reports for submission
to the OWNER and DIVISION.

k. Verifying and keeping records of construction items of work accomplished for use as a basis of checking
contractors’ monthly estimates.

|. Consultation and advise during construction.

m. Determination of need for and preparation of change orders for approval by the OWNER and DIVISION
based on conditions found during construction and/or additions or modifications to the work requested
by the OWNER and approved by the ENGINEER and the DIVISION and implemented at a price
recommended by the ENGINEER as equitable. For change order items exceeding $10,000, the ENGINEER
shall prepare an independent cost estimate.

n. Determination of “equality” for substitution of materials and equipment specified and securing DIVISION
approval thereof.

o. Provide and maintain construction control lines and grades. For sewers offset lines and grade elevations,

with cut depths at manholes; at treatment plant and pumping station sites base lines for layout and

>~>oan

q. Preparation of certificate of substantial completion and contract completion.
r. Assist the OWNER in obtaining the required project related approvals of State and Federal agencies.