Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 5/17/2017 - P457

Finance Committee - Agenda - 5/17/2017 - P457

By dnadmin on Mon, 11/07/2022 - 10:26
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
457
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

LINE EXISTING SMH-S1935 \

CHESTNUT STREET

T Bee Ne: CB- D14903/& CONNECTING
| pipe. INSTALL 26LF + OF 10" DIA Pvc
PIPE

fr" LINE

WALNUT ST

a r
0+00
o- S SEWER SEWER

A

7

™

REPLACE SERVICE CONNECT

| CIPP LINE +190LF OF
15" TILE PIPE

ION TO ROW (TYP.)

MATCH EXISTING PIPE SIZE 6" MIN. LOCATION IS
APPROXIMATE AND LENGHT I{S UNKNOWN

INSTALL FITTING FOR SEWER
CONNECTIONS TO CIPP LINED
PIPE (TYP.) ITEM 2f

ae

e—

va LIMITS OF WORK

2+49.95
®

\ LINE EXISTING SMH-S1934

ROAD RESTORATION:

TEMPORARY
2" TEMP PAVE.

FINAL
2" GRAVEL
2.25" BASE PAVE

J

VO NASHUA, NEW HAMPSHIRE (issue pence)

a 4 20 0 20 40 80 PLAN OF PROPERTY LOCATION

CITY OF NASHUA NEW HAMPSHIRE ——=———————— 2017 SEWER PROJECT =

CITY ENGINEER'S OFFICE ONTAL SCALE PROPOSED N =

9 RIVERSIDE STREET DRAWN BY: DESIGNED BY: REVIEWED BY: Lor 24
NASHUA, NEW HAMPSHIRE 03062 JUNO. REVISION DESCRIPTION DATE ] N. QUINTERO J. MENDOLA B. KEATING JL

Page Image
Finance Committee - Agenda - 5/17/2017 - P457

Footer menu

  • Contact