Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 5/17/2017 - P386

Finance Committee - Agenda - 5/17/2017 - P386

By dnadmin on Mon, 11/07/2022 - 10:26
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
386
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

7. The Contractor installing the Sectional Lining system shall have completed at
least three (3) projects, in the United States, within the past three (3) years and
projects that included CIPP installation lengths of at least 300 continuous
linear feet, on-site wet-out or resin impregnation of the liner tube, and design
of a similarly sized Sectional Liner wall thickness based on a fully deteriorated
condition.

8. Supervisory personnel shall have a minimum of three (2) years experience and
shall have completed at least two (2) projects of similar size and complexity as
this project with the United States within the past three (3) years. Attach
r[Jsum[]s of each person named. R[Jsum[] information shall include, at a
minimum, educational background, the number of years in a supervisory
capacity and a list of completed projects within the past two (2) years,
including project description, complexity and contract total amounts.

1.04 SUBMITTALS

The Contractor shall submit the following information:

A.

MATERIALS

Contractor shall provide submittals on all lining materials and resins, and shall
furnish the manufacturers’ certifications that all of the liner materials are in
compliance with the specifications, codes, and standards referenced herein. The
submittals shall include installation instructions and details of all component
materials and construction methods. The Contractor shall also provide the liner
tube manufacturer’s certifications, field measurements, and pipe sizing
calculations which demonstrate that the liner tube has been properly sized to avoid
the creation of wrinkles or folds. The Contractor shall furnish Material Safety
Data Sheets for all appropriate materials to be used in the project.

INSTALLATION

The Contractor shall submit the method of liner insertion, liner size, thickness
calculations, and assumptions used as the basis for calculations for review by the
Engineer prior to the start of work. The liner shall provide complete structural
support without considering any structural support from the existing pipe except
during construction.

1.04 WARRANTY

A.

WARRANTY

The Contractor shall provide the Owner with a warranty to be in force and effect
for a period of one (1) year from the date of final acceptance of the project by the
Owner. The warranty shall cause the Contractor to repair or replace the liner
should failure or damage result from faulty materials or installation. At the end of
the warranty period, the Owner may perform a television inspection to confirm the
condition of the liner.