SECTION 02650
CURED-IN-PLACE PIPE (CIPP) LINING OF EXISTING SEWERS
PART 1 GENERAL
1.01 DESCRIPTION
A.
SCOPE
The work consists of furnishing all labor, equipment, materials, and incidentals
required to rehabilitate existing sewer mains by the installation of cured-in-place
pipe (CIPP) into the existing main. Work will include bypass pumping, sewer
cleaning, initial closed circuit television (CCTV) inspection of sewers to be lined,
installation of liner, reconnection of service connections, final closed circuit
television (CCTV) inspection, and all other related work. All such work shall
comply with these specifications and the specific product manufacturer’s
recommendations. Any conflict between the product manufacturer’s
recommendations and any portion of the contract documents shall be resolved
with the Owner prior to proceeding with the work.
SAFETY
This standard does not address safety problems associated with the use of this
product. It is the responsibility of the user of this standard to establish appropriate
safety and health practices and determine the applicability of regulatory limitations
prior to use.
1.02 REFERENCES
A.
ASTM STANDARDS
The following references are part of this Specification. The latest edition of the
following references shall be used:
ASTM D 543: Standard Test Methods for Resistance of Plastics to
Chemical Reagents.
ASTM D 638: Standards Test Methods for Tensile Properties of
Plastics.
ASTM D 790: Standard Test Methods for Flexural Properties of
Unreinforced and Reinforced Plastics and Electrical
Insulating Materials.
ASTM D2990: Standard Test Methods for Tensile, Compressive,
and Flexural Creep and Creep-Rupture of Plastics.
ASTM F 1216: Standard Practice for Rehabilitation of Existing
Pipelines and Conduits by the Inversion and Curing
of a Resin-Impregnated Tube.
02650-1