Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 5/17/2017 - P374

Finance Committee - Agenda - 5/17/2017 - P374

By dnadmin on Mon, 11/07/2022 - 10:26
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
374
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

SECTION 02619

REPLACEMENT OF EXISTING DRAINS

PART 1 - GENERAL

1.01 WORK INCLUDED:

This section covers those areas of work where the proposed sewers will cross existing drain
pipes and structures.

1.02 RELATED WORK:
A. Section 02300, EARTHWORK.
B. Section 02085, POLYVINYL CHLORIDE GRAVITY PIPE AND FITTINGS.
1.03 REFERENCES:
The following references form a part of this specification:
American Society for Testing and Materials (ASTM)
ASTM C76 - Reinforced Concrete Culvert, Storm Drain and Sewer Pipe
PART 2 - PRODUCTS
2.01 © REPLACEMENT PIPE:

Reinforced concrete pipe used to repair or replace existing drains shall meet the
requirements of ASTM C76.

PART 3 - EXECUTION
3.01 GENERAL REQUIREMENTS:

A. _ Present information indicates that the existing drains are constructed of reinforced concrete
pipe (RCP) or corrugated metal pipe (CMP) unless otherwise noted on the drawings.

B. The approximate locations and depths of existing drains are indicated on the drawings, if
they are known.

02619-1

Page Image
Finance Committee - Agenda - 5/17/2017 - P374

Footer menu

  • Contact