SECTION 02534
FILL SEWER PIPE OR STRUCTURE (TO BE ABANDONED)
PART 1 - GENERAL
1.01 WORK INCLUDED:
The existing sewer pipe to be abandoned in place shall be completely filled with
"Flowable Fill" after the sewerage has been re-routed through the new sewer main
This work shall include all materials, labor, pumping, shoring, and cleanup required
to complete this item.
1.02 RELATED WORK:
Section 02631, PRECAST MANHOLES AND CATCH BASINS
1.03 SUBMITTALS: INACCORDANCE WITH REQUIREMENTS OF THE GENERAL
SPECIFICATIONS, SUBMIT THE FOLLOWING:
The contractor shall submit his proposed method for filling the cement pipe to the
Engineer for approval 2 weeks prior to scheduling the work. The "Flowable Fill"
mix shall be comprised of Portland cement, water, sand and other additives to insure
that the material shall flow the entire length of the pipe and completely fill the void.
The mix design for the "Flowable Fill" shall be submitted to the Engineer for
approval.
PART 2 - PRODUCTS - NOT APPLICABLE
PART 3 - EXECUTION
3.01. INSTALLATION:
A No work shall be done without approval from the Engineer. The contractor shall
demonstrate to the Engineer by visual inspection or other means that the existing
pipe has been completely filled.
B. — All work shall be done with the proper tools and by careful workmen competent to do
work.
END OF SECTION
02534-1