2.07
2.08
locations shown on the drawing or as directed by the Engineer. This work shall
include all material, labor and equipment necessary to complete the work.
Item 6f(1), Common Excavation for Roadway, will be used to remove the portion
of the roadway materials a depth sufficient to accommodate the proposed gravel
base, asphalt binder and asphalt top and, as directed by the
Engineer, additional curb reveal.
PROJECT START-UP AND PROJECT CLOSE OUT:
MOBILIZATION:
The lump sum for this item shall constitute full compensation to the Contractor
for the general mobilization and demobilization necessary to make the contract
operational, exclusive of the cost of materials.
The total for mobilization shall not exceed 5 percent of the total of all bid items
excluding this item.
Contractor shall be paid on a prorated basis.
The work shall be paid at the contract unit price per UNIT for Item 7a.
MAINTENANCE AND PROTECTION OF TRAFFIC:
Uniformed officers and flagmen will be measured by the actual number of hours
authorized, as determined by the Engineer. The Contractor's schedule for
utilizing uniformed officers and flagmen shall be agreed upon cooperatively with
the Engineer. The Contractor may furnish additional traffic control personnel at
his expense but only those agreed upon by the Engineer will be measured for
payment. Payment for uniformed officers and flagmen shall include full
compensation for material, equipment and labor to complete this portion of the
Bid Schedule.
SERVICES OF UNIFORMED NASHUA POLICE OFFICERS
This work shall consist of furnishing qualified flaggers or uniformed officers,
with or without vehicles, as required to direct traffic through or around the Work
as ordered by the Engineer.
The Contractor shall supply qualified uniformed officers as stated in Section 618
of the NHDOT Standard Specifications for Road and Bridge Construction,
(Approved and Adopted in 2010). Uniformed officers shall only be used when
there are no available flaggers and the Engineer has previously approved it.
Daily coverage needs to be approved by the Engineer.
01150 - 20