Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 5/17/2017 - P269

Finance Committee - Agenda - 5/17/2017 - P269

By dnadmin on Mon, 11/07/2022 - 10:25
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
269
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

2.05

2.06

Additional material removed due to changed conditions or as ordered by the
Engineer shall be measured for payment by the cubic yard.

The unit price for this item shall constitute full compensation for excavation,
disposal of material, protection of curbing and sidewalk and all other work
incidental to removal and disposal of excess material.

ENVIRONMENTAL PROTECTION
CALCIUM CHLORIDE:

Calcium chloride shall be measured per pound applied as ordered by the
Engineer.

The work shall be paid for at the contract unit price per pound for Item 5a.
SILT SACK
Silt Sacks shall be measured per each.

The unit price for each Silt Sack shall include the cost of maintenance, repair
and/or replacement of the Silt Sack for which payment has been made. Silt sacks
shall be of the size, shape and materials as shown in the detail sheet11 of the plan
set. Installation of cut filter fabric shall not be considered as payment for a silt
sack.

The work shall be paid for at the contract unit price per each for Item Sb.
ROADWAY RECONSTRUCTION
CRUSHED GRAVEL:

Crushed gravel shall be measured per cubic yard, in place and shall conform to
Section 304 of the NHDOT Standard Specifications. Width to be measured for
payment shall be as directed and approved by the Engineer. Over-excavated
trenches will not be allowed.

The unit price for this item shall include placement of crushed gravel in the top
12" or 18”0f the sewer trench or roadway as shown on the plans immediately
below the permanent pavement, or as ordered by the Engineer and shall
constitute full compensation for all other work incidental to placement of the
crushed gravel. Note payment for crushed gravel shall not include the 12-inches
of crushed gravel to be placed below the temporary pavement described in
Section D below.

Crushed Gravel work shall be paid for at the contract unit price for Item 6b.