To facilitate the proper and timely payment of applications, the City of Nashua requires that all invoices contain
a valid PURCHASE ORDER NUMBER.
6.02 Progress Payments; Retainage
A. Progress Payments. The OWNER will once each month make a progress payment to the
CONTRACTOR on the basis of an estimate of the total amount of work done to the time of the estimate and its value as
prepared by the CONTRACTOR and approved by the ENGINEER. All such payments will be measured by the
schedule of values established in paragraph 2.07.A of the General Conditions (and in the case of Unit Price Work based
on the number of units completed) or, in the event there is no schedule of values, as provided in the General
Requirements.
B. Retainage. Not applicable for this Contract.
6.03 Final Payment
A. Upon final completion and acceptance of the Work in accordance with paragraph 14.07 of the General
Conditions, OWNER shall release final payment only after the project has been accepted.
ARTICLE 7 - CONTRACTOR'S REPRESENTATIONS
7.01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the following representations:
A. CONTRACTOR has examined and carefully studied the Contract Documents and the other related data
identified in the Bidding Documents.
B. CONTRACTOR has visited the Site and become familiar with and is satisfied as to the general, local,
and Site conditions that may affect cost, progress, and performance of the Work.
C. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws and Regulations
that may affect cost, progress, and performance of the Work.
D. CONTRACTOR has carefully studied all (if any): (1) reports of explorations and tests of subsurface
conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or
subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in the
Supplementary Conditions as provided in paragraph 4.02 of the General Conditions and (2) reports and drawings of a
Hazardous Environmental Condition, if any, at the Site which has been identified in the Supplementary Conditions as
provided in paragraph 4.06 of the General Conditions.
CONTRACTOR is entitled to rely upon the general accuracy of the “technical data” as provided in paragraph 4.2 of the
General Conditions. CONTRACTOR acknowledges that such reports and drawings are not Contract Documents and
may not be complete for CONTRACTOR's purposes. CONTRACTOR acknowledges that OWNER and ENGINEER
do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the
Contract Documents with respect to Underground Facilities at or contiguous to the site.
E. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all
additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions
(surface, subsurface and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or
performance of the Work or which relate to any aspect of the means, methods, techniques, sequences and procedures of
construction, if any, expressly required by the Contract Documents to be employed by CONTRACTOR, and safety
precautions and programs incident thereto.
AG - 3 of 6