Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 6/7/2017 - P609

Finance Committee - Agenda - 6/7/2017 - P609

By dnadmin on Mon, 11/07/2022 - 10:24
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
609
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

16010-2
ELECTRICAL - GENERAL

F. Work Specified Herein:

1.

Visit and examine the project site and become familiar with all existing
conditions pertinent to the work to be performed thereon. No additional
compensation will be allowed for failure to be so informed. This contractor is
responsible to be familiarized with the conditions of the project during the
bidding period in order to bring any clarifications or issues to the attention of
the Engineer prior to submission of his/her final bid price.

The following scope of work is a brief generalization of the type and extent of
the work specified under DIVISION 16. Detailed requirements are indicated
on the Drawings and in related sections of the Specifications. The work
specified under DIVISION 16 includes, but is not limited to the following:

a. Provide Electrical Service and Distribution Systems as indicated on the
"Single-Line Diagrams", related drawings and schedules, and as specified
herein. There is a significant amount of electrical demolition and
reconnection of equipment to remain for the work required for this project
and therefore a thorough understanding of the existing conditions 1s critical.
It is to be understood that the drawings do not intend to show or provide
details for all of the existing conditions or equipment to be demolished. In
addition, not all existing condition information may reflect exact conditions
due to the accuracy of existing data and information. As an example there
are a significant number of existing branch circuit panelboards which have
been listed and shown for this project. The existing panelboard schedules
have been shown and noted as could be determined or as noted on existing
information. The Contractor's responsibility is to field investigate and
determine all existing conditions. Any and all existing equipment which is
found to remain shall be reconnected to new panelboards with new conduit
and wiring of equal sizing and conditions which presently exists in order to
provide a complete system reconnection. No exception will be allowed for
any extra compensation to perform this work This contractor is responsible
to be familiarized with the conditions of the project during the bidding
period in order to bring any clarifications or issues to the attention of the
Engineer prior to submission of his/her final bid price.

b. Provide complete lighting system(s), including all necessary fixtures,
hangers, wiring, connections, controls and lamps for areas as shown on the
Drawings and as specified herein.

c. Provide all required 480 Volt, 208 Volt, 240V, and 120 Volt Power and
Control wiring, Signal wiring, grounding, and connections for equipment
specified under DIVISIONS 11, 13, 14, and 15 as applicable except as
indicated on the Drawings and specified herein.

d. Provide all required and supplemental motor starters, protective device
sizes, wire and conduit sizes, holding coil voltages and control voltages
specified under DIVISIONS 15. All rating and sizing shall match the
requirements of equipment specified. No additional compensation will be
allowed for modifications required due to equipment and devices which
differ from those of specified equipment.