Document Date
Meeting Description
Document Type
Meeting Date
Page Number
578
15750-2
HOT WATER COILS
PART 3 - EXECUTION
3.1 INSTALLATION
A. Install in strict accordance with the manufacturer's instructions and recommendations
and as shown on drawings.
B. Install with shut off valves, control valves, balancing valves, air vents and duct
transitions as required for unit operation and balancing.
END OF SECTION
13089K
Page Image