Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 6/7/2017 - P575

Finance Committee - Agenda - 6/7/2017 - P575

By dnadmin on Mon, 11/07/2022 - 10:24
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
575
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

15671-4
DUCTLESS SPLIT SYSTEM HEAT PUMP UNITS

h. Fan speed controls shall be user-selectable: high, medium, low or
microprocessor controlled automatic operation during all operating
modes.

The unit shall be protected against the following:

i. Indoor coil freeze-up.

j. Indoor coil high temperature protection shall be provided to detect
excessive indoor discharge temperature when unit is in heat pump mode.

5. Filters:
Units shall have filter rack with factory-supplied washable filter.
C. Systems shall be:

1. Mitsubishi
2. Daitkin
3. Or equal

PART 3 - EXECUTION

3.1 INSTALLATION
A. All system components shall be installed in strict accordance with the manufacturer’ s
instructions, recommendations and as shown on the Drawings.

3.2 STARTUP, TESTING, AND TRAINING
A. Provide startup, testing and training in accordance with the requirements of Section
01800.

END OF SECTION

13089K

Page Image
Finance Committee - Agenda - 6/7/2017 - P575

Footer menu

  • Contact