3.5
3.6
3.7
15604-11
AUTOMATIC TEMPERATURE CONTROL (ELECTRIC)
Provide combined training and operational assistance for plant operators in the proper
operations of the ATC system equipment, and in the techniques, methods, schedules,
etc. associated with maintenance.
The level of the training and operational assistance provided shall be as required to
ensure proper understanding of the equipment's operations, maintenance and warranty
conditions. Should the representative require time in addition to the minimums
indicated herein to sufficiently detail the proper operations and maintenance of the
equipment, it will be provided at no additional cost to Owner. Under absolutely no
circumstances shall warrantees become void due to Owner's failure to follow
operational and maintenance procedures which were not fully detailed and described
in Owner's representatives during these sessions.
At the Owner's discretion, the training sessions may be video recorded for Owner's
future use.
The system provider representative shall fill out the Equipment Training Certification
form included within this Section. Training will not be considered complete until this
form has been provided to the Engineer.
IDENTIFICATION
A.
B.
Provide all control equipment, panels and manual controls with black lamacoid
nameplates engraved with white letters indicating the function, tag number, service
or apparatus being served.
Properly number all wires and terminals where applicable.
GUARANTEE
A.
The control system designated on Drawings and plans and herein specified, shall be
guaranteed to be free from original defects in both material and workmanship for a
period of one (1) year of normal use and service, excepting damages from other
causes. This guarantee shall become effective starting the date the Owner begins to
receive beneficial use of the system.
PROGRAMMED MAINTENANCE
A.
Upon completion of the installation, the control contractor shall submit to the Owner
for consideration, an agreement, to provide the necessary programmed maintenance
to keep the various control systems in proper working condition.
This proposed programmed maintenance agreement shall fully describe the
maintenance work to be performed and shall advise the cost of this work during the
1-year guarantee period provided as part of this Contract by the ATC Contractor as
well as for subsequent years thereafter.
13089K