Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 6/7/2017 - P542

Finance Committee - Agenda - 6/7/2017 - P542

By dnadmin on Mon, 11/07/2022 - 10:24
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
542
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

15600-1

SECTION 15600

HVAC - GENERAL

PART 1 - GENERAL

1.1 DESCRIPTION
A. Work included:

l.

Furnish all labor, materials, equipment and transportation as required to
completely install the heating and ventilation system as shown on the Drawings
and as specified herein.

The heating and ventilating work shall include, but not be limited to the
following:

Heating system piping, valves, supports, and specialties.

Heat generation and transfer equipment.

Ductwork and devices.

Air moving and air handling equipment.

Automatic temperature control systems.

Pipe and equipment insulation.

Balancing air and water systems.

Connections to equipment installed by other trades.

Installation of components and devices furnished by other trades that are
located in Heating and Ventilating piping, ducts, or equipment.

“so mono se

B. Related Work Specified Elsewhere (When Applicable):

NAW RYWNS

Excavation and backfill is specified in Division 2.

Concrete is specified in Division 3.

Structural steel is specified in Division 5.

Painting is specified in Division 9.

Pipe Sleeves and Seals are specified in Section 15092.

Pipe Hangers and Supports are specified in Section 15094.

Pipe, insulation, ductwork, dampers, fans, etc., are specified in the appropriate

Sections in this Division.

Electrical Work:

a. The H&V work shall include the installation of all motors, temperature
controls, limit switches, etc., as herein specified. All 480-volt, 208-volt,
and 120-volt wiring and connections, and all motor starters, not specified
in this Section, will be provided under Division 16 - Electrical.

b. — All 24 volt wiring and auxiliary devices required for the specified systems,
equipment and operations indicated in this Section shall be provided under
this Section, unless specifically indicated on the Drawings related to
Division 16 - Electrical. This shall include, but is not necessarily limited
to, all wiring for automatic temperature and damper modulation control.

c. The materials and methods for all electrical work provided under this
Section shall comply with the requirements specified under Division 16 -
Electrical. Coordinate equipment ratings, starter sizes, protective device

13089K

Page Image
Finance Committee - Agenda - 6/7/2017 - P542

Footer menu

  • Contact