Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 6/7/2017 - P541

Finance Committee - Agenda - 6/7/2017 - P541

By dnadmin on Mon, 11/07/2022 - 10:24
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
541
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

15444-2
NATURAL GAS SYSTEM

7. Install a gas cock and union in the pipe adjacent to each appliance, in such a
manner that the appliance may be removed without disturbing the gas piping.
Gas pipe sizes are based on the terminal equipment designed around. The Contractor
shall confirm line sized based on NFPA 54 sizing criteria for the terminal equipment
provided on the job prior to the start of the installation.
Leak testing shall be in accordance with NFPA 54 requirements. Test pressure shall
be 1 % times working pressure. Test duration shall be not less than % hour for each
500 ft? of pipe volume. Piping system shall withstand the test pressure without
showing any evidence of leakage.
Purging: After piping has been tested, the Contractor shall fully purge the gas piping
in accordance with NFPA 54.

END OF SECTION

13089K

Page Image
Finance Committee - Agenda - 6/7/2017 - P541

Footer menu

  • Contact