Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 6/7/2017 - P539

Finance Committee - Agenda - 6/7/2017 - P539

By dnadmin on Mon, 11/07/2022 - 10:24
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
539
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

15401-1

SECTION 15401

PLUMBING, PIPING AND SPECIALTIES

PART 1 - GENERAL

1.1

DESCRIPTION
A. Work Included: Furnish and install a complete piping system including all required
specialties and appurtenances as indicated on the Drawings and as herein specified.
B. Related Work Specified Elsewhere:
1. “Steel Pipe & Fittings” is specified in Section 15061.
2. “Plumbing General” is specified in Section 15400.
3. “Natural Gas System” 1s specified in Section 15444.

PART 2 - PRODUCTS

2.1

MATERIALS
A. Pipe and Fittings:
1. Gas Lines:

a. 1/2 inch and larger: Schedule 40 black steel with malleable iron fittings.
B. Valves:
1. Acceptable Manufacturers:
a. Stockham.

b. Crane.

c. Walworth.
d. Jenkins.

e. Nibco

f. Or approved equal.

2. Ball Valve: Acceptable in lieu of gate and globe valves for 2 inch and
smaller, full port bronze ball, threaded or solder ends, 3 part bronze body,
TFE or equal resilient seat, lever handle, 400 lb. WOG. Equal to NIBCO S-
595-Y (soldered end connection) or NIBCO T-595-Y (threaded end
connection).

PART 3 - EXECUTION

2.2

INSTALLATION

A. Provide offsets in all piping to place in proper position and avoid work of other
trades.

B. Install all valves with stems horizontally to upright. Do not install with stems
down.

END OF SECTION

13089K

Page Image
Finance Committee - Agenda - 6/7/2017 - P539

Footer menu

  • Contact