Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 6/7/2017 - P517

Finance Committee - Agenda - 6/7/2017 - P517

By dnadmin on Mon, 11/07/2022 - 10:24
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
517
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

15051-2
POLYVINYL CHLORIDE (PVC) DRAINAGE PIPE

1. Clear each pipe length, coupling and fitting of all debris and dirt before
installing.
2. Provide and use coupling pullers for joining the pipe.
3. Shove home each length of pipe against the pipe previously laid and hold
securely in position.
4. Donot pull or cramp joints.
Fabrication:
1. Cutting:
a. Usea hand saw or pipe cutter with blades (not rollers).
b. Examine all cut ends for possible cracks caused by cutting.
2. Connecting:
a. Solvent weld connections as recommended by the manufacturer.
b. Connect pipe and fittings only when temperature is above the minimum
recommended by the manufacturer.
c. Threaded adapters shall be connected only with plastic male into metal
female.

END OF SECTION

13089K

Page Image
Finance Committee - Agenda - 6/7/2017 - P517

Footer menu

  • Contact