Page 2 of 3
General Conditions
Payment & Performance Bonding
Daily offloading, clean up & dumpsters for daily debris
Equipment, tooling, dust barriers & misc.
Project Management & Daily Supervision
Submittals
Project close out documentation
eneral Construction
e Remove existing suspended metal panel ceilings, suspension system and lighting in
designated areas & dispose of
e Furnish & install new 2’ x 2’ suspended acoustical ceiling system per plans &
specs
e Cut & patch roof as needed
e Fumish & install steel @ new roof penetration
Roofing
Cut new opening in roof deck
Patch deck as needed
Roof protection
Furnish & install wood nailers
Flash curb and pocket into existing rubber roof
lectric
e Demo & new power wiring, conduit and lighting per plans and specs
HVAC
e Demo existing duct, air handler units & associated appurtenances
e Fumish & install new equipment, temperature controls / conduit & wiring,
test & balance and hoisting / rigging
QUALIFICATIONS:
e All work to be scheduled and completed with RTU #1 & #2
e All work is based on normal working hours 7:00 am — 3:30 pm Monday through
Friday
e Ajl areas (including roof) to be inspected prior to work commencing to verify
existing conditions, damage, etc.