16010-14
ELECTRICAL - GENERAL
INSTALLATION
A. Installation shall be as specified in the appropriate Sections of DIVISION 16.
TESTS
A. Refer to all related requirements as set forth within SECTION 16950 and additional
testing as indicated in the appropriate Sections of DIVISION 16.
CLEANING
A. Do not allow refuse and surplus materials to accumulate on the project site during
the course of the work. Areas shall be cleaned and picked up on a daily basis.
B. Uponcompletion of the work, remove all refuse and surplus materials and leave the
premises neat and clean on a daily basis.
C. Clean all equipment surfaces and touch up all damaged surfaces to the satisfaction
of the Engineer.
D. Clean all lighting fixture reflector assemblies, lenses, louvers and lamps upon
completion of the installation.
END OF SECTION