Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 6/7/2017 - P301

Finance Committee - Agenda - 6/7/2017 - P301

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
301
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

1.13

1.14

1.15

16010-13
ELECTRICAL - GENERAL

a. Electrical subcontractor is responsible to review the HVAC Drawings and
Specifications to determine the power conduit and wiring requirements.
Electrical subcontractor is responsible to implement conduit and wiring needs
to match the functional descriptions in DIV. 15 except that specifically
identified as being provided by the HVAC subcontractor. HVAC subcontractor
shall be responsible for all control, low voltage 24VDC / 24VAC, conduit and
wiring. This shall include, but is not necessarily limited to, wiring for automatic
temperature control, and control wiring for plumbing systems. The HVAC
subcontractor shall provide all miscellaneous 120VAC control from HVAC
control panels to final control devices, as required, unless specifically included
in Electrical work per the Drawings and Specifications.

BID ALTERNATES

A.

Refer to DIVISION 1 of the Contract Drawings for all work related to Bid Alternates
for this project. Bid Alternates have been identified and described for specific work
areas and equipment. The Contractor shall determine all associated work and costs
required for these items for a complete system.

The drawings indicate and define areas where work related to the bid alternates
under this section is required. This has been noted and shown as clearly as possible.
However it does not show each and every possible component for these bid
alternates. Therefore it shall be the contractor's responsibility to include all
associated materials, labor and costs associated with the required bid alternatives for
a complete system.

MEASUREMENT AND PAYMENT

A.

Measurement and payment for the work described in this section will be made in
accordance with the provisions of DIVISION 1 MEASUREMENT AND
PAYMENT.

REQUEST FOR INFORMATION

A.

When there is a conflict or coordination issue, or if additional information is
necessary for the contractor to proceed with the intended work, a Request of
Information (RFI) form shall be submitted through the General Contractor to the
Engineer. The specific issue shall be described in the RFI and shall be sent to the
engineer for review and a response provided in an appropriate time period. RFI form
shall be available via the General Contractor through the Engineer as required for
this contract. This process shall be used as part of the work of this contract.

PART 2 - PRODUCTS

2.1

MATERIALS

A.

B.

Materials shall be as specified in the appropriate Sections of DIVISION 16.
No exceptions to the Engineer of materials shall be as indicated in these Sections.

PART 3 - INSTALLATION

13089K

Page Image
Finance Committee - Agenda - 6/7/2017 - P301

Footer menu

  • Contact