Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 6/7/2017 - P248

Finance Committee - Agenda - 6/7/2017 - P248

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
248
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

GUESTIONS RECEIVED

I.

Will the Plant Electrician repair an electric or communications line accidently severed
during construction that is not marked in the field?

Answer: Yes, however the contractor must excavate in a slow and cautious manner. The

contractor should remove a small amount of material in each in each scoop, 1-foot or less
of depth. Additional hand digging or probing should be done in advance of excavation to
verify there are no unknown utilities present.

Shouldn't a 6-inch inserta valve be installed on the water line that feeds around the
primary clarifiers before installing the two 3-inch valves?

Answer: Yes, if there are sufficient funds in the project to cover this additional cost. If
not the City reserves the right to eliminate the additional 6-inch valve and use pipe
freezing methods to isolate the two 3-inch valves (if more cost effective). An additional
6-inch inserta valve was added to the bid sheet and is shown on the drawings.