Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 6/7/2017 - P168

Finance Committee - Agenda - 6/7/2017 - P168

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
168
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

8.06 Insurance

See Article 5.
8.07 Change Orders
A. OWNER is obligated to execute Change Orders as indicated in paragraph 10.03.
8.08 Inspections, Tests, and Approvals
A. OWNER's responsibility in respect to certain inspections tests, and approvals is set forth in paragraph 13.03.B.
8.09 Limitations on OWNER'S Responsibilities
A. The OWNER shall not supervise, direct, or have control or authority over, nor be responsible for,
CONTRACTOR's means, methods, techniques, sequences, or procedures of construction, of the safety
precautions and programs incident thereto, or for any failure of CONTRACTOR to comply with Laws and
Regulations applicable to the performance of the Work. OWNER will not be responsible for CONTRACTOR's
failure to perform the Work in accordance with the Contract Documents.

8.10 Undisclosed Hazardous Environmental Condition

A. OWNER's responsibility in respect to an undisclosed Hazardous Environmental Condition is set forth in
paragraph 4.06

8.11 Evidence of Financial Arrangements

A. If and to the extent OWNER has agreed to furnish CONTRACTOR reasonable evidence that financial
arrangements have been made to satisfy OWNER's obligations under the Contract Documents, OWNER's
responsibility in respect thereof will be as set forth in the Supplementary Conditions.

ARTICLE 9 - ENGINEER'S STATUS DURING CONSTRUCTION

9.01 OWNER’s Representative

A. ENGINEER will be OWNER's representative during the construction period. The duties and responsibilities
and the limitations of authority of ENGINEER as OWNER's representative during construction are set forth in
the Contract Documents and will not be changed without written consent of OWNER and ENGINEER.

9.02 Visits to Site

A. ENGINEER will make visits to the Site at intervals appropriate to the various stages of construction as
ENGINEER deems necessary in order to observe as an experienced and qualified design professional the
progress that has been made and the quality of the various aspects of CONTRACTOR's executed Work. Based
on information obtained during such visits and observations, ENGINEER, for the benefit of OWNER, will
determine, in general, if the Work is proceeding in accordance with the Contract Documents. ENGINEER will
not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the
Work. ENGINEER's efforts will be directed toward providing for OWNER a greater degree of confidence that
the completed Work will conform generally to the Contract Documents. On the basis of such visits and
observations, ENGINEER will keep OWNER informed of the progress of the Work and will endeavor to guard
OWNER against defective Work.

GC - 35 of 57

Page Image
Finance Committee - Agenda - 6/7/2017 - P168

Footer menu

  • Contact