Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 6/7/2017 - P162

Finance Committee - Agenda - 6/7/2017 - P162

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
162
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

8. All changes or modifications which result from the final inspection.

The As-built marked prints shall be delivered to the ENGINEER at the time of final inspection for ENGINEER's
review and approval. All approval and acceptance of As-built drawings shall be accomplished before final
payment is made to the CONTRACTOR.

6.13 Safety and Protection

A. CONTRACTOR shall be solely responsible for initiating, maintaining and supervising all safety precautions
and programs in connection with the Work. CONTRACTOR shall take all necessary precautions for the safety
of, and shall provide the necessary protection to prevent damage, injury or loss to:

1. All persons on the Site or who may be affected by the Work;

2. All the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site;
and

3. Other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways,
structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the
course of construction.

B. CONTRACTOR shall comply with all applicable Laws and Regulations relating to the safety of persons or
property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all
necessary safeguards for such safety and protection. CONTRACTOR shall notify OWNER of adjacent property
and of Underground Facilities and other utility Owner’s when prosecution of the Work may affect them, and
shall cooperate with them in the protection, removal, relocation, and replacement of their property. All damage,
injury, or loss to any property referred to in paragraph 6.13.A.2 or 6.13.A.3 caused, directly or indirectly, in
whole or in part, by CONTRACTOR, any Subcontractor, Supplier, or any other individual or entity directly or
indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be
liable, shall be remedied by CONTRACTOR (except damage or loss attributable to the fault of Drawings or
Specifications or to the acts or omissions of OWNER or ENGINEER or ENGINEER’S Consultant, or anyone
employed by any of them, or anyone for whose acts any of them may be liable, and not attributable, directly or
indirectly, in whole or in part, to the fault or negligence of CONTRACTOR or any Subcontractor, Supplier, or
other individual or entity directly or indirectly employed by any of them). CONTRACTOR’s duties and
responsibilities for safety and for protection of the Work shall continue until such time as all the Work is
completed and ENGINEER has issued a notice to OWNER and CONTRACTOR in accordance with paragraph
14.07.B that the Work is acceptable (except as otherwise expressly provided in connection with Substantial
Completion).

C. Occupational Safety and Health Standards: CONTRACTOR's methods of construction and safety
requirements, including but not limited to trench excavation and shoring where applicable, shall conform to the
requirements of the Occupational Safety and Health Standards for the Construction Industry. The document
entitled "Occupational Safety and Health Standards for the Construction Industry" (29 CFR PART 1926) with
Amendments as of February 1, 1998, including 29 CFR part 1910 General Industry Safety and Health Standards
Applicable to Construction, is not attached to the Contract Documents. Said requirements as identified and
established above are incorporated herein by reference.

D. Power Lines: No equipment of any kind shall be used or permitted within such proximity to the conductors of
the Public Services of New Hampshire power lines as to be in violation of the safe working clearance prescribed
by the National Electrical Safety Code.

GC - 29 of 57