Technical Specifications iIFB0660-040617
2017 Pavement Preservation
Revised per Addendum #1
* AASHTO M-320, Table 1
o “EB” Jnr 3.2 kPa @ 64°C: <0.5%
© R3200 (Average % Recovery) @ 3.200 kPa: >70%
= 8% polyester reinforcing fibers
Time is of the essence in the completion of this work in order to minimize disruption to the
traveling public, and to reduce the Owner’s cost for police details and inspections of the work in
progress. Accordingly, bidders shall submit with their bid the volumetric capacity (in gallons) of
the melter kettle proposed to perform the work, together with a statement regarding their average
anticipated daily production rate or range of gallons per day of material expected to be applied.
The Owner reserves the right to consider its costs for traffic control and inspections in addition to
contractor’s bid prices to determine the proposal with lowest overall costs.
F. MEASUREMENT AND PAYMENT
Crack Sealing with Polymer & Crumb Rubber Modified Asphalt Compound with Reinforcing
Fibers (Crack Sealing) will be paid by the gallon (Gal) of crack sealing complete in place.
Payment for Crack Sealing includes full compensation for material, labor, transportation, and
equipment necessary to complete this portion of the Bid Schedule. No payment shall be made for
materials delivered on site but not placed.
17