EXHIBIT C
Fee Schedule
5700-
PART t- GENERAL
1. APPLICANT - . 2. GRANT/LOAN NO.
3. NAME OF CONTRACTOR OR SUBCONTRACTOR - 4. DATE OF PROPOSAL
5. ADDRESS OF OR SUBCONTRACTOR ( Include ZIP ; SERVICE TO BE FURNISHED
Commerce Way, Suite 302, Portsmouth, NH 03801 Construction Phase - Construction
Administration. Resident Services. O&M
Manual, Record Drawings, and Start-up
PART tl - COST
7. DIRECT LABOR HOURS TOTAL
. Technical Advisor
Lead
- Civil
- Mechanical
- Electrical
| Assistant
DIRECT LABOR TOTAL:
ESTIMATED |
| INDIRECT COSTS indirect cost x BASE = COST
15,741.
INDIRECT COSTS TOTAL:
OTHER DIRECT COSTS
TRAVEL
1) TRANSPORTATION
Resident Services - Ti
TRAVEL COSTS TOT.
EQUIPMENT, MATERIALS, SUPPLIES
etc.
SUBTOTAL :
SUBCONTRACTS
00
00
SUBCONTRACTS SUBTOTAL : 00
OTHER (Specify categories) ESTIMATED
COST COST
Resident $131.11 04
OTHER SUBTOTAL : 04
e. OTHER DIRECT COSTS TOTAL : j ae
0. TOTAL ESTIMATED COST
1. PROFIT
2. TOTAL PRICE