Page 2 of 2
EXHIBIT B —- SCOPE OF WORK
2. Resident Inspection and Other Special Services
a. The ENGINEER agrees to provide a part-time Resident Project Representative (RPR) on
the project to assist the ENGINEER in the work of General Administration and in
observing construction activity for compliance with the contract documents and any
associated change orders. The OWNER shall be notified in writing of the name of the RPR
and shall be provided with a brief history of the RPR's construction experience. The RPR
shall be in the employ of and under direct control of the ENGINEER. It is further agreed
that failure of the RPR to administer the PROJECT to the satisfaction of the OWNER is
deemed to be sufficient basis for their removal from the PROJECT and replacement.
b. The ENGINEER agrees to provide supervision of initial start-up and operation and for
services during the twelve-month warranty period and to prepare the Project Performance
Certification and associated documentation.
c. Preparation of an Operation and Maintenance Manual for approval by the OWNER. After
OWNER approval, the ENGINEER agrees to supply three (3) sets of the completed manual
to the OWNER.
d. Preparation of record drawings of the work as constructed. Three (3) sets of prints to be
furnished (1) to the OWNER