EXHIBIT B —- SCOPE OF WORK
General Construction Administration
. Updating and modifications of contract documents to meet changed site and project
conditions or variations in State or Federal requirements.
. Completion of formal contract documents for the award of contracts.
. Checking detail construction, shop and erection drawings submitted by the contractor.
. Reviewing laboratory, shop, and mill test reports of materials and equipment.
. Preparation of drawings and technical material as required supplementing and/or clarifying
the contract documents.
. Review, verification, and approval of estimates for periodic and final payments to the
contractors for submittal to the OWNER.
. Periodic inspection of work and final inspection.
. Observing and reporting performance and qualifying tests required by specifications.
i. Keeping daily records of construction progress and compiling same into progress reports
for submission to the OWNER.
j. Verifying and keeping records of construction items of work accomplished for use as a
basis of checking contractors’ monthly estimates.
. Consultation and advise during construction.
. Determination of need for and preparation of change orders for approval by the OWNER
based on conditions found during construction and/or additions or modifications to the
work requested by the OWNER and approved by the ENGINEER and implemented at a
price recommended by the ENGINEER as equitable. For change order items exceeding
$10,000, the ENGINEER shall prepare an independent cost estimate.
. Determination of "equality" for substitution of materials and equipment specified and
securing OWNER approval thereof.
. Preparation of application, supporting and associated documents for Federal, State, and
other grant or loan programs, including monthly reimbursement requests.
. Preparation of certificate of substantial completion and contract completion.
. Assist the OWNER in obtaining the required project related approvals of State and Federal
agencies.