Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 6/21/2017 - P50

Finance Committee - Agenda - 6/21/2017 - P50

By dnadmin on Mon, 11/07/2022 - 10:22
Document Date
Wed, 06/21/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/21/2017 - 00:00
Page Number
50
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__062120…

Q-014

Q-015

Q-016

Q-017

Q-018

Q-019

Q-020

BONNETTE, PAGE & STONE CORPORATION
91 BISSON AVENUE, LACONIA, NH 03246
TEL: 603.524. 3411 Fax: 603. 524. 4641

“Progress on Purpose”

Construction Management @ Design/Build Services

Spec Section 099123 does not call out a finish topcoat & sheen for
Galvanized Metals. Please specify the desired coating system.
Benjamin Moore Ultra Spec HP D.T.M. Acrylic Enamel

Spec Section 099123 does not call out a desired paint system for the
Exposed Structure Ceiling. Please specify if a Dryfall system is acceptable
or what should be carried for the bid.

Dryfall is acceptable. S/W pro industnal waterbome acrylic dryfall is one
product.

RCP calls for the ceiling in Tower 209 to be ETR. Finish schedule calls for
Tower 209 ceiling to be painted. Which is correct?
Paint

Fitness Room 218 is open to structure. It is not called off on the Finish
schedule as such and therefore does not specify any finishes. What is the
desired finish for the ceiling?

The room will be open to structure, painted.

There is no detail of the overhang at the new Apparatus bay door. Please
clarify the soffit detail above door 110?
Yet to be fully detailed, but most likely an exterior metal soffit.

Linoleum is now being used for the Kitchen ... do you have a spec for this
material?

use sheet goods, color determined later by Owner:

Armnstrong LinoArt Marmorette Linoleum

Who will supply the plymovent and connections.
Plymovent will be supplied & installed by Owner's subcontractor.

Spec pg. 221005-3 sect 2.3 sanitary waste and vent. Specifies No-Hub
cast iron pipe and fittings. At the walk through yesterday the existing looks
to be sch 40 PVC w/DWY fittings. As shown on the drawings there are
multiple tie-ins to the existing material. Please clarify which material to be
used.

The mechanical engineer assumed cast iron because of durability. Price
cast iron in base pricing and PVC as deduct altemate.

3 of 4