oaths NASHUA FIRE 3 - GMP 001 RENO
Bonnette. Poge & Stone
Job: 121821866 - NASHUA FIRE 3 GMP 001 RENO
TY Reference Type AdjQty Units AdjUnitCost Labor Material Equipment SubContr Other XtdCost
L 08.805.28 087100 - DOOR FRAME 1.00 LS 420.00 420.00 0.00 0.00 0.00 0.00 420.00
& HW INSTALL
Subtotal: Steel Doors & Frames (08-805) $777.00 $1,772.00 $0.00 $0.00 $0.00 $2,549.00
Subtotal: Doors and Windows (08) $777.00 $1,772.00 $0.00 $0.00 $0.00 $2,549.00
Finishes ( 09)
Tile ( 09-920)
S 09.920.16 CERAMIC TILE PATCH 1.00 LS 1,980.00 0.00 0.00 0.00 1,980.00 0.00 1,980.00
ALLOWANCE
Subtotal: Tile (09-920) $1.00 LS $1,980.00 $0.00 $0.00 $0.00 $1,980.00 $0.00 $1,980.00
Acoustical Ceilings ( 09-925)
S 09.925.04 095113 - ACOUSTICAL 1.00 LS 2,650.00 0.00 0.00 0.00 2,650.00 0.00 2,650.00
CEILING TILE SUB-OUT
Subtotal: Acoustical Ceilings (09-925) $1.00 LS $2,650.00 $0.00 $0.00 $0.00 $2,650.00 $0.00 $2,650.00
Resilient Flooring ( 09-940)
S 09.940.12 096513, 096519, 096813 1.00 LS 15,424.00 0.00 0.00 0.00 15,424.00 0.00 15,424.00
- RESILIENT FLOORING
SUB-OUT
S 09.940.16 FINAL CLEANING 6,577.00 SF 0.45 0.00 0.00 0.00 2,959.65 0.00 2,959.65
Subtotal: Resilient Flooring (09-940) $0.00 $0.00 $0.00 $18,383.65 $0.00 $18,383.65
Seamless Flooring ( 09-950)
S 09.950.09 096723 - RESINOUS 1.00 LS 18,457.50 0.00 0.00 0.00 18,457.50 0.00 18,457.50
FLOORING
Subtotal: Seamless Flooring (09-950) $1.00 LS $18,457.50 $0.00 $0.00 $0.00 $18,457.50 $0.00 $18,457.50
Printed: 5/17/2017 4:20:22 PM Estimator: Barry Beauregard Bonnette, Page and Stone Corp. Page: 3