BPS NASHUA FIRE 3 GMP 002 no elevator
a ee
Job: 121821875 - NASHUA FIRE 3 GMP 002 no elevator
TY Reference Type AdjQty Units AdjUnitCost Labor Material Equipment SubContr Other XtdCost
General Requirements ( 01)
Site Supervision ( 01-101)
L 01,101.02 SUPERINTENDANT 1.00 LS 81,000.00 81,000.00 0.00 0.00 0.00 0.00 81,000.00
SALARY
M 01.101.04 SUPERINTENDANT 6.00 MO 640.00 0.00 3,840.00 0.00 0.00 0.00 3,840.00
BENEFITS
Subtotal: Site Supervision (01-101) $81,000.00 $3,840.00 $0.00 $0.00 $0.00 $84,840.00
Time / Project Management ( 01-102)
M 01.102.04 PROJECT 27.00 WK 720.00 0.00 19,440.00 0.00 0.00 0.00 19,440.00
MANAGEMENT
Subtotal: Time / Project Management (01- $27.00 WK $720.00 $0.00 $19,440.00 $0.00 $0.00 $0.00 $19,440.00
102)
Field Layout ( 01-103)
L 01.103.02 FIELD LAYOUT 1.00 LS 1,000.00 1,000.00 0.00 0.00 0.00 0.00 1,000.00
M 01.103.03 FIELD LAYOUT 1.00 LS 500.00 0.00 500.00 0.00 0.00 0.00 500.00
MATERIALS
Subtotal: Field Layout (01-103) $1,000.00 $500.00 $0.00 $0.00 $0.00 $1,500.00
Temporary Barricades ( 01-106)
M_ 01.106.02 TEMPORARY 1.00 LS 3,540.00 0.00 3,540.00 0.00 0.00 0.00 3,540.00
BARRICADE
MATERIALS
L 01.106.04 TEMPORARY 1.00 LS 3,780.00 3,780.00 0.00 0.00 0.00 0.00 3,780.00
BARRICADE
INSTALLATION/REMOV
AL
Subtotal: Temporary Barricades (01-106) $3,780.00 $3,540.00 $0.00 $0.00 $0.00 $7,320.00
Temporary Buildings and Storage ( 01-107)
M 01.107.04 TEMPORARY 1.00 LS 6,000.00 0.00 6,000.00 0.00 0.00 0.00 6,000.00
BUILDINGS
Subtotal: Temporary Buildings and Storage $1.00 LS $6,000.00 $0.00 $6,000.00 $0.00 $0.00 $0.00 $6,000.00
(01-107)
Printed: 5/31/2017 8:57:45 AM Estimator: Barry Beauregard Page: 1