Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 7/5/2017 - P44

Finance Committee - Agenda - 7/5/2017 - P44

By dnadmin on Mon, 11/07/2022 - 10:22
Document Date
Wed, 07/05/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 07/05/2017 - 00:00
Page Number
44
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__070520…

2 of 2
C. Final Coat: Urethane coating, thickness 2 mils + .5. Color to be charcoal brown.
2.4.2 The paint system shall be applied per the manufacturer’s recommendations.
Method of Measurement
3.1 Metal deck form and structural steel clean and paint will be measured as a unit. A unit will
consist of the materials, equipment, and labor necessary to complete the work, including, but not

limited to, access, cleaning, galvanizing repairs, painting, disposal of removed/waste materials,
and mobilization.

Basis of Payment
4.1 The accepted quantity of metal deck form and structural steel clean and paint will be paid
for at the contract unit, complete in place. Payment will be full compensation for furnishing all

labor, tools, equipment, materials, and incidentals necessary to complete the work.

4.1.1 All costs for mobilization to complete repairs as needed shall be included in each
item as needed.

Pay item and unit:

1001.5 Metal Deck Form and Structural Steel Clean and Paint Unit

Nashua / 16-0186 / 2/15/2017

Page Image
Finance Committee - Agenda - 7/5/2017 - P44

Footer menu

  • Contact