NASHUA
February 15, 2017
SPECIALPROVISION
Item 1001.4 — Approach Repairs
Description
1.1 This work shall consist of pavement and subbase removal, grading, and paving the northern
approach as shown in the contract plans.
Materials
2.1 Subbase material shall be crushed gravel conforming to the requirements of Item 304.3 of
the NHDOT Standard Specifications.
2.2 Bituminous sidewalk shall conform to the requirements of Item 608.13 of the NHDOT
Standard Specifications.
Construction Requirements
3.1 Pavement saw cuts shall conform to the requirements of section 628 of the NHDOT
Standard Specifications.
3.2 Subbase placement and preparation, and pavement placement shall conform to
the requirements of section 608 of the NHDOT Standard Specifications.
3.3 The existing ground shall be compacted as directed by the engineer prior to the placement
of the subbase material.
Method of Measurement
4.1 Approach repairs will be measured as a unit. A unit will consist of the materials,
equipment, and labor necessary to complete the work, including, but not limited to, pavement
saw cuts, removal of existing pavement, subbase excavation, grading and existing ground
compaction, placement of subbase and pavement materials, and mobilization.
Basis of Payment
5.1 The accepted quantity of approach repairs will be paid for at the contract unit complete in
place. Payment will be full compensation for furnishing all labor, tools, equipment, materials,
and incidentals necessary to complete the work.
Nashua / 16-0186 / 2/15/2017