Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 7/5/2017 - P39

Finance Committee - Agenda - 7/5/2017 - P39

By dnadmin on Mon, 11/07/2022 - 10:22
Document Date
Wed, 07/05/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 07/05/2017 - 00:00
Page Number
39
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__070520…

500

2 of 2
Method of Measurement

3.1 Temporary superstructure shoring will be measured as a unit for each location. A unit will
consist of the design, construction, maintenance and removal of temporary superstructure
shoring. Each location will consist of all the bearings used to support one end of any given span.

Basis of Payment

4.1 The accepted quantity of temporary superstructure shoring will be paid for each location
specified at the contract unit complete in place. Payment will be full compensation for preparing
and submitting construction drawings, details, procedures, and calculations as specified,
performing the work specified including assuming all liability for the structure being shored and
for furnishing all labor, tools, equipment, materials, and incidentals necessary to complete the
work.

4.1.1 When the structure or bearing has been jacked and blocked onto its temporary
position, a payment of 75 percent of the Contract unit price will be allowed. The remaining 25
percent will be paid when all shoring or falsework has been removed and the site cleaned up.

Pay item and unit:

500.03 Temporary Superstructure Shoring Unit

Nashua / 16-0186 / 2/15/2017