T. Buck Construction, Inc.
249 Merrow Rd Auburn, ME 04210
207-783-6223 * FAX 207-783-3970
PROPOSAL 28A
(802) 431-1422 Date 8/21/2017
(866) 783-7101
Proposal Submitted to: Phone:
Wright-Pierce Fax:
Street: Job Name
230 Commerce Way, Suite 302
Nashua Wastewater Treatment Facility Headworks Upgrade
City, State & Zip Cade:
Portsmouth, NH 03801
Job Location:
Nashua NH
Engineer:
Andy Morrill
Job Phone:
pve hereby submit specifications and estimate for:
Material
Labor
15% O&P
GC O&P 10%
TOTAL
will be based on $180.00/hr.
Provide labor, material and equipment to perform work to relocate 2" waterline that interferes with installation on new HV-3A
$ 673.16
$ 1,200.00
$ 1,873.16
$ 280.97
$ 2,154.13
$
3
1) T Buck will request a 3 day extension to the contract completion time if this proposal is excepted
2) Owner is to confirm that they can completely shut down system prior to us doing the work. If not additional time for shut down
TWO THOUSAND THREE HUNDRED & FORTY ONE DOLLARS
We Propose hereby to furnish material and jabor compiete in accordance with above specifications, for the sum of.
il material is guaranteed to be as specified. Ail work to be completed ina
Weorkmantike manner according to standard practices. Any alteration or
viation from above specifications involving extra costs will be executed only
f. written orders, and will become an extra charge over and above the
estimate. All agreements contigent upon strikes, accidents or delays beyond
Authorized
Signature
Mark McPheters
Note: This proposal may be withdrawn
wr control. Owner te carry fire, tomade and other necessary insurance. Our by us if not accepted within § days.
workers are fully covered by Workman's Compensation insurance.
Acceptance of Proposal- The above prices, specifications and
ihe work as specified. Payment will be made as outlined above.
[pee of acceptance Signature