The installation of a new CHP system at the Milford Regional Medical Center was executed as a fast
track project by Waldron. Milford was looking for cost savings and resiliency for their campus. The new
CHP system included a packaged 800 kW natural gas fired Caterpillar engine and waste heat recovery.
Heat from the jacket water system and the engine exhaust are utilized to produce 15 psig steam for the
hospital low pressure system. Energy from the engine lube oil system was recovered and utilized for the
domestic hot water system. The CHP system will provide operational cost savings and in the event of a
power outage, could supplement the emergency diesel engines to provide power to the hospital. The
project was completed in 10 months, from notice to proceed to utility acceptance testing.
Scope of work included:
e Construction Permitting
e Balance of Plant—Detailed Design
e Review CAT Supplied Equipment
Submittals
e Elevated Gas Permit Variance
Construction
e Commissioning
WALDRON
Regionai ‘)
Medical Center
ee
QUICK FACTS
Location:
Bets 0] gr rd
in Service:
Firm Role:
Lea] n=\ei ra
WALDRON | SINEE =F ING & | C ne
37 INDUSTRIAL DRIVE = SUITE G-1
WALDRON.COM
Size & Technology:
JIN ISS | fF
EXETER, NH 03833
Milford, MA
danuary 2015
8G0 kW Recip. Engine
December 2015
Peis emma p siege (re) pm
commissioning
Joseph Boczanowski
LB igeieire] whe) gl w= (esr (ts)
josboz@milreg.org
(508) 422-2499
UCTION, INC
603.772.7153