Z PROJECT SHEET
BRIGHAM AND WOMEN'S HOSPITAL
Boston, MA
Waldron Engineering & Construction, Inc. was contracted to do a study for Brigham and
Women’s Hospital (BWH) to evaluate the feasibility and economic value of installing a
Combined Heat and Power Plant (CHP) in theit new Brigham’s Building for the Future
(BBF). The primary purpose for the CHP is to provide operational cost savings to the
hospital and a level of resiliency to serve the energy needs of the facility. In addition to
studying various CHP technologies, including combustion turbine generator and recipro-
cating engine generators, Waldron appraised the value of supplying electrical and thermal
which is part of the Brigham and Women’s Hospital campus.
Upon identifying that a 4 MW reciprocating engine based CHP was the optimal size and
technology to serve the two buildings, Waldron executed the detailed design of the entire
central energy plant. The building is expected to be occupied in late spring 2016.
energy not only to the new BBF building, but also to the neighboring Shapiro building
pug) BRIGHAM AND Sera
WOMEN’S HOSPITAL [Bae err
tates ¢ Medical Soba
Study Date: Nov. 2072
Design Start: Feb. 2013
Design Complete: July 2074
In Service: Spring 2016
Firm Role: Feasibility Study, Schematic Design,
Design Development, Detailed Design,
Technology: 4 MW Reciprocating Engine Generator,
125 psig Waste Heat Boiler, Jacket
Water Heat Recovery, {2} 7/00 BHP
Firetube Boilers
George Player, CPE, FMA
Director Engineering
Brigham and Women's Hospital
617.732.6721
WALDRON —° PUN & CONSTRUCTION, ihc.
37 INDUSTRIAL DRIVE SUITE G-1 EXETER, NH 03633 603.772.7153
WALDRON COM