Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 10/4/2017 - P96

Finance Committee - Agenda - 10/4/2017 - P96

By dnadmin on Mon, 11/07/2022 - 10:20
Document Date
Wed, 10/04/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/04/2017 - 00:00
Page Number
96
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100420…

WALDRON

37 Industrial Ave.
Exeter, NH 03833

One Penn Plaza,
36" Floor
New York, NY 10119

Michael D. Adams, P.E., Lead Controls Engineer

Neptune Wave Power — Dallas TX
Project Description: Research and development of wave power generation technology.

Role: Controls Engineer responsible for creation of control algorithms to provide for
most efficient means of power generation.

Vermont Public Power Supply Authority — Swanton, VT

Project Description: Detailed engineering, procurement, and construction of two GE
Frame 5 peaking gas turbines that will utilize bio-diesel as a fuel source. The 40 MW
plant includes a complete de-mineralized water treatment facility for water injection
/NOx control.

Role: Staff Controls Engineer responsible for preliminary design of control system
including development of control architecture.

LyondellBasell — Lake Charles, LA

Project Description: Detailed engineering, procurement, and construction of two
nominal 8.0 MW natural gas fired reciprocating engines with exhaust and jacket
water heat recovery, a single 15 MW gas turbine generator with an unfired HRSG
and two package boilers.

Role: Staff Controls Engineer responsible for control system design including
creation of control architecture; instrument, valve, and controls bid specifications;
construction specifications; and loop drawings & logic for control of plant systems.

Pfizer — Groton, CT
Project Description: Detailed engineering of 10 MW cogeneration facility with a
combustion turbine generator, heat recovery steam generator, and emissions

monitoring.

Role: Staff Controls Engineer responsible for control system design including
creation of control architecture; instrument, valve, and controls bid specifications;
construction specifications; and loop drawings & logic for control of plant systems.

One Bryant Park — New York, NY

Project Description: Detailed engineering of a nominal 4.5 MW recuperated gas
turbine, a duct-fired heat recovery boiler and a 400-ton absorption chiller. The
cogeneration plant was designed integral to the new Bank of America Tower, a high-
rise office tower located at Bryant Park in Manhattan and will supply the building’s
heating energy needs, plus a portion of its electrical and cooling energy requirements.

Role: Staff Controls Engineer responsible for control system design including

creation of control architecture; instrument, valve, and controls bid specifications;
construction specifications; and loop drawings & logic for control of plant systems.

WALDRON

Page Image
Finance Committee - Agenda - 10/4/2017 - P96

Footer menu

  • Contact