Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 10/4/2017 - P95

Finance Committee - Agenda - 10/4/2017 - P95

By dnadmin on Mon, 11/07/2022 - 10:20
Document Date
Wed, 10/04/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/04/2017 - 00:00
Page Number
95
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100420…

WALDRON

37 Industrial Ave.
Exeter, NH 03833

One Penn Plaza,
36°" Floor
New York, NY 10119

Michael D. Adams, P.E., Lead Controls Engineer

Role: Staff Controls Engineer responsible for review and approval of all controls-
related documentation submitted by B&W including control architecture, system
process descriptions, I/O list, and SAMA logic diagrams.

Yale University Central Power Plant — New Haven, CT
Project Description: Performance testing, startup, and commissioning of new boiler
and diesel generator installations at Yale’s Central Power Plant.

Role: Staff Controls and Mechanical Engineer responsible for creation of
commissioning procedures for various subsystems as well as creation of boiler
performance test procedure.

DCO Energy LLC,
Project Description: Performance testing of hot water system (four 1200 HP boilers)

and chilled water system (six 2500 ton chillers) to determine if system meets design
standards.

Role: Staff Controls & Mechanical Engineer responsible for generation of
performance test procedures and performance test calculations.

University of Massachusetts Medical Center — Worcester, MA

Project Description: Detailed engineering of a 7.5 MW gas turbine plant with a high
pressure (1,100 psig, 900°F) heat recovery boiler, an electric chiller, and integration
with existing steam turbine generators and steam-driven chillers.

Role: Staff Controls Engineer responsible for responding to construction submittals
and RFIs, and creation of startup & commissioning procedures.

Vineland Municipal Electric Plant — Vineland, NJ
Project Description: Detailed engineering of a 64MW peaking power plant utilizing a
dual-fuel Rolls Royce Trent 60 turbine.

Role: Staff Controls Engineer responsible for construction submittal reviews and
RFIs as well as startup and commissioning support.

Harvard University Blackstone Station — Cambridge, MA
Project Description: Detailed engineering of the conversion of Units 11 & 12, two
multiple-burner boilers, from No. 6 fuel oil to dual-fired natural gas and No 6 fuel oil

units.

Staff Mechanical and Controls Engineer responsible for P&IDs, control architecture,
procurement specifications and construction specifications, site surveying, and
demolition plans.

WALDRON

Page Image
Finance Committee - Agenda - 10/4/2017 - P95

Footer menu

  • Contact