Nashua Wastewater Treatment Plant Responsibilities
The NWTF will cither provide 480V, 3 ph, 100 amp service or a portable generator
capable of providing this power.
The NWTF electrician will connect the contractor’s equipment to the service connection
or portable generator.
Plant water (non-potable) will be available to use from nearby yard hydrant(s). Water
pressure is around 100psi. NWTF will provide hoses and nozzles for contractor use in
cleaning and diluting as necessary.
The NWTF will dewater the secondary digester to the extent possible prior to start of
dewatering by contractor.
The NWTF will transport sludge from the primary digester to the secondary digester to
the extent possible.