Preventive Maintenance
[2.8% MOTOROLA SOLUTIONS
Site Frequency Standard | = 7
Check | Check lights and indicators for A/B receivers.
Basic Voice Call Check _- Voice test each voice path, radio to radio. x
Control Channel x x
Redundancy (trunking) . Roll control channel, test, and roll back.
Site Controller x x
Redundancy (trunking) | Roll site controllers with no dropped audio.
Complete GTR tests - Frequency Error, Modulation Fidelity, K x
Forward at Set Power, Reverse at Set Power, Gen Level Desense
GTR 8000 Results Sheet {| no Tx. 7
scat
| MOSCAD ) CHECKLIST
"MOSCADSERVER levell Level 2
Equipment Alarms Verify no warning/alarm indicators. x x
| Check Alarm/Event Review MOSCAD alarm and events to find if there are chronic x x
_ History issues. oo
Windows Event Logs Review Windows event logs, Save and clear if full, . x x!
Site devices to verify passwords. Document changes if any x
| Password Verification | found. a ce ene
Perform audit of software media on site. Versions, KC numbers, % x
Verify System SW CO's __| types, etc.
Verify System SW Verify software versions installed on server. Document any | x
Installed changes.
Server CPU Health i.e. memory, HDD, CPU, Ddsk space/utilization. x
: Verify security patches monthly/quarterly (Motorola and 3rd x
Verify Patches Party). Document any changes.
MOSCAD CLIENT Level1 Level 2
Equipment Alarms _ Verify no warning/alarm indicators. xn xX |
Check Alarm / Event Review MOSCAD alarm and events to find if there ; are > chronic x x
History issues.
Windows Event Logs Review Windows event logs. Save and clear if full. x x
Site devices to verify passwords. Document changes if any x %
| Password Verification found.
Perform audit of software media on site. Versions, KC numbers, x x
Verify System SW CD's types, etc.
Verify System SW Verify software versions installed on system. Document any x
Installed changes.
Verify security patches monthly/quarterly (Motorola and 3rd 7
Verify Patches Party}. Document any changes.
Server CPU Health ihe. memory, HDD, CPU, disk space/utilization. x
Verify backups have been done or scheduled. $Z database (BAR}, x
Complete Backup Centracom CDM/ADM database, etc.
MOSCAD RTU's Level1 _Leve! 2
Equipment Alarms Verify no warning/alarm indicators. x x
x x
Verify Connectivity
Verify Connectivity