Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 10/18/2017 - P84

Finance Committee - Agenda - 10/18/2017 - P84

By dnadmin on Mon, 11/07/2022 - 10:20
Document Date
Wed, 10/18/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/18/2017 - 00:00
Page Number
84
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__101820…

MOTOROLA SOLUTIONS

Preventive Maintenance

Check (RR set-up parameters, and also audio card set-up and x
IRR Setup Parameters level adjustments
Confirm all paging controls are functional {including third party x
Paging Controls encoders if under maintenance)
COMPUTER PERFORMANCE TESTING taveli Level 2
Computer Reboot Reboot op position computer x x
Computer Operational Confirm client computer is fully operational (if applicable) x x
For XP and older x
Operating Systems:
Hard Drive
Fragmentation Check status of hard drive fragmentation- perform if needed
Event Logs Full event logs and review for major errors Xx
Hard Drive Backup Create backup of drive for offsite storage. x
Memory Usage Check memory usage x
Application Logs and x
Alerts Review built in application logs and alerts
Hard Drive Usage Check available space (10% minimum) x
AUDIO TESTING fevell Level 2
Audio Levels and Confirm all conventional resources are functional with adequate x x
Quality audio levels and quality
Secure Mode Confirm any secure talkgroups are operational in secure mode x
Confirm all trunked resources on screen are functioning by
placing a call in both directions {at the customer discretion} and
Trunked Resources at a single op position
EQUIPMENT ROOM TESTS Leveli Level 2
Recording - AIS Test Verify audio logging of trunked calls x x
Test op position logging on analog recorder (with customer x K
Recording assistance)
System Alarms Review alarm system on all equipment for errors x
Perform audit of software media on site. Versions, KC numbers, x x
Verify System SW CD's types, etc.
SDM AUX 1/0 Server Confirm all AUX 1/O's functional on one operator position x
Confirm all backup radios meet RF specs and combiner/antenna x
Backup Resources system fully functional
Verify System SW Verify software versions installed on system. Document any x
installed changes.
if redundant equipment used (e.g., routers, switches}, then x
IP Network Redundancy | switch to redundant equipment and confirm operation.
new i

Eieat

Level 2) i

| Equipment Equipment Alarms

ites no warning/alarm indicators.

Clean Fans and

Equipment

Use antistatic vacuum to clean cooling pathways

Page Image
Finance Committee - Agenda - 10/18/2017 - P84

Footer menu

  • Contact